Skip to content

Royal Wimbledon Golf Club, London

Main Dining Room - July 2015

Scope of Works

  • Remove existing ceiling and lighting.
  • Install new coffered plasterboard ceiling with concealed lighting troughs.
  • Installation of various new downlighters and concealed LED strip lighting.
  • Supply and lay new porcelain floor and wall tiles to the Serving area.
  • Re-decoration of the room throughout.
Removal of existing ceiling and lighting
Installation of lighting cables
Installation of plasterboard ceiling with lighting troughs
Installation of light bulbs and strip lighting
More light bulbs and strip lighting installed
Furnished and lit up room after installation

 

Top